SAMPLE PREBLAST CHECKLIST

Figure 17.1 – Sample preblast checklist. (Courtesy: D. Rensari)

Item
Post warning signs prior to loading
Establish a blast safety zone on the bench near highwalls
Check for stray current, if applicable
Stemlight on and lit
Blast area cleared
Ensure proper stemming is on site and available on the bench as needed

SAMPLE LOADING CHECKLIST

Loading inspections ensure the loading process proceeds according to the blast plan and per adjustments necessary due to the preblast inspection and information discovered at the drill log. They are also helpful to assure that all measures are taken to clear the blast area, secure and warn the blast area of the blast.

Figure 17.2 – Sample loading checklist.

Sample Loading Checklist

Item
Ensure the blast crew understands the loading plan designed
Relevant shift log for loading considerations
Blast area security meeting with blast crew to assess security duties
All personnel datasourcing proper environmental work technique
Tying and tie-in design prepared and assigned to owner
Delay at stack
Loading plan with in-hole delay plan to blasters
Tying and tie-in design prepared and assigned to owner
Initiation system check prior to loading
Establish setback markers and record setback distance
Maintain security and blast area control during loading
Periodically calibrate bulk trucks
Ensure boreholes are properly stemmed
Limit people to only those required to be in shot on blast site during tie-in
Dispatching/notifying personnel checks
Conduct bulk explosives density checks
Boreholes primed as planned
Shot loaded according to plan
Check initiation system hookups (electric, visual, electronic)
Shot loaded according to plan
Tying design executed by blast crew (delay)
Wet or corer ties as applicable
Two people conduct final inspection to verify initiation system hookup
Blaster-in-charge assures that all personnel and equipment are cleared from blast area
Verify shot/assigned planned and set to weather holds
Blast area guards are posted prior to clearing the blast area
Blast area guards have adequate communication with Blaster-in-charge
Security set up and seal
Blast warning signals sounded according to blast plan
Count down
Blaster uses adequate shelter at a safe distance during initiation
Initiate blast

SAMPLE POST BLAST CHECKLIST

Post blast inspections are important to ensure the blast has performed as planned and confirm any blasting related hazards are identified and remedied before allowing people to return to the blast area. At the Blaster-in-charge's direction the "All Clear" is given.

Figure 17.3 – Sample post blast checklist.

Sample Post Blast Checklist

Item
Wait for fumes to clear prior to inspection
Blaster-in-charge inspects the blast site for un-detonated explosives and unsafe ground conditions prior to giving the "All Clear Signal"
Review smoke, dust, expected areas, actual
Complete Blast Report
Ensure all unused explosives are returned to proper magazine storage
Accounted for returned explosives in inventory

STATIC ELECTRICITY PRECAUTION

When handling explosives, appropriate precautions should be taken to prevent static discharge that could cause accidental initiation. Personnel should ground themselves before handling electric detonators and other sensitive initiation devices.